2 tunnels dug through in China-Laos Railway construction

          Source: Xinhua| 2019-04-15 19:28:29|Editor: zh
          Video PlayerClose

          LAOS-OUDOMXAY-CHINA-LAOS RAILWAY-TUNNEL CONSTRUCTION

          A staff member of China Railway No. 5 Engineering Group stands at the entrance to Nathong No. 2 Tunnel of China-Laos Railway after the tunnel was dug through in Oudomxay Province of Laos, some 400 km north of Lao capital Vientiane, April 15, 2019. Two tunnels of the China-Laos Railway, namely Nathong No. 2 and Nateuy No. 2, were dug through on the same day on Monday by the constructor China Railway No. 5 Engineering Group. (Xinhua/Hu Yong)

             Prev 1 2  

          KEY WORDS:
          YOU MAY LIKE
          EXPLORE XINHUANET
          010020070750000000000000011100001379790851
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  偷自拍亚洲综合在线不卡 | 中文字幕乱码中文乱码二区 | 日本日本乱码伦视频在线观 | 亚洲青青青在线观看 | 日韩久久激情精品 | 开心五月激情中文在线观看 |