Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

          Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
          Video PlayerClose

          CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

          Photo taken on Feb. 12, 2019 shows an emergency worker climbing the power transmission tower for the rush repairs in the mountain area of Wuhan, capital of central China's Hubei Province. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

             Prev 1 2 3 4 5 Next  

          KEY WORDS:
          EXPLORE XINHUANET
          010020070750000000000000011100001378454891
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  久久精品国产亚洲777 | 好吊操好吊妞在线观看妞 | 亚洲日本中文字幕天天更新 | 偷偷做久久久久免费网站 | 亚洲一区二区三区四区精品视频在线观看 | 亚洲综合久久精品一区二区 |